We are pleased to refer you to our Airports Commission page to see the LAANC response to the Final Consultation Questions.
Wednesday, 4 February 2015
Tuesday, 20 January 2015
Davies Commission Consultation
Laanc will be discussing their response to the recent Davies Commission on additional runways at Londons Heathrow Airport at their meeting on Friday 22nd January.
If you have any views please use the "contact us" button on our
web site www.laanc-heathrow.org.uk
If you have any views please use the "contact us" button on our
web site www.laanc-heathrow.org.uk
Friday, 9 January 2015
HOMES 'TURMOIL' IF HEATHROW EXPANDED
Creating up to 70,800 homes if Heathrow expansion plans go ahead would cause "absolute turmoil", a Windsor councillor has said.
![]() |
| The Airports Commission is considering the option of a third runway north-west of Heathrow, nearer to Windsor |
Malcolm Beer made his comments ahead of a Windsor council aviation forum later.
He said a third runway north-west of the airport could create the need to use greenbelt land for housing.
A Heathrow spokesman said: "There will be little or no need for additional house-building over and above current local authority plans."
'Commercial greed gone mad'
The housing concern comes after a recent report by the Airport Commission, which stated the Heathrow expansion would create between 47,400 and 112,400 jobs by 2030, which in turn would require an extra 29,800 to 70,800 homes to be created in the surrounding area, including Windsor, Slough and London boroughs.
Read the full article on the BBC News Berkshire site, http://www.bbc.co.uk/news/uk-england-berkshire-30726088
Wednesday, 19 November 2014
AIRPORTS COMMISSION
![]() |
| Airports Commision Consultation Document |
The Airports Commission has just published its consultation on the three options it has shortlisted for increasing the UK’s long-term aviation capacity. The consultation is open until the 3rd of February and seeks
views on the three options for a new runway in the south east of England,
and on its assessments of these options. In particular, the Commission
wishes to:
- test the evidence base it has assembled
- understand stakeholders’ views as to the accuracy, relevance and breadth of the assessments it has undertaken
- seek views on the potential conclusions that might be drawn from them.
They
are also interested in evidence and ideas about improving the
short-listed options (e.g. through mitigation measures to address specific
impacts).
LAANC will be responding to the consultation after its Meeting on 23rd January 2015.
Monday, 27 October 2014
LONDON AIRSPACE CHANGES/PRECISION NAVIGATION – UPDATE
Precision navigation (PRNAV) is now fitted to all new aircraft and is precise up to heights of 4000ft, it is more fuel efficient, direct and more precise in the 3km wide take off swathes. This will enable an increase in take offs at some airports. Respite within the swathe will be varied with aircraft being directed to a more definitive position within the swathe. This may well increase respite for some and be less for others.
![]() |
| Precision Navigation |
Trials of PRNAV prove increased departures are possible and with aircraft following a more precise line will allow more frequent take offs. There has been adverse response from previously non affected areas at both ends of Heathrow Airport. Teddington has been badly affected by the trials on easterlies and Ascot / Sunningdale / Bracknell / Englefield Green on westerlies, generating many complaints from residents not previously affected by aircraft noise. LAANC is trying to ascertain what is to be done following the trial before it is imposed on communities outside the 57db contour. Trials are being run by NATS, but PRNAV is being driven by the European aircraft control service.
DAVIES COMMISSION –UPDATE
The Davies Commission is to issue a Consultation shortly on the remaining options i.e. Gatwick 2nd runway and the two Heathrow third runway options.
An 8/10 week consultation is expected on the key areas identified by the Commission. The results of this consultation will go to the Commission Work Group but will not be published until after the General Election.
It is unlikely that the Commission will ask for additional surveys etc. i.e. questioning 57db 16 hour bench marks as it is now out of date, despite LAANC pressure for them to do so.
An 8/10 week consultation is expected on the key areas identified by the Commission. The results of this consultation will go to the Commission Work Group but will not be published until after the General Election.
It is unlikely that the Commission will ask for additional surveys etc. i.e. questioning 57db 16 hour bench marks as it is now out of date, despite LAANC pressure for them to do so.
Subscribe to:
Posts (Atom)




